Typical Machine Configurations

Tube Bending:

Example:
Fuel Lines An automatic bender for Left and Right Hand Parts.
Brake Lines A part with 7 bends made from 12mm aluminum tubing.
Chair Frames Machine exported to Europe required metric components.
Air Conditioning Lines with and without manifolds The part-to-part cycle time was 8.5 seconds for a pair of parts.
 

Rod Bending:

Example:
Gearshifts - column mounted Transmission Shifters A transmission shift lever with three bends and a forged steel end. A manually loaded hydraulic/pneumatic machine was built to bend the 5/8 diameter solid steel rod. A cycle time of 9.5 seconds, including loading and unloading, was achieved.
 

Wire Bending:

Example:
Seat Frames
Paper Coated Wire
A combination bender for a Left/Right Hand two-bend part. Material: .075 diameter wire wrapped with paper. A fully automatic machine was designed and built to bend over 1400 parts per hour. Tooling changeover between left and right hand parts was less than 30 seconds.